EUROPE
Polimi Leco, Politecnico di Milano, Italy
New construction with active chilled beams ACB40. Total number of units: 42
Polimi Como, Politecnico di Milano, Italy
New construction with active chilled beams ACB40. Total number of units:139
British Embassy, Stockholm, Sweden
Refurbishment Installation of 250 custom made induction terminal units for heating operation only
Boots the Chemist HQ, Nottingham, UK
Refurbishment
Installation of 339 custom made floor mounted induction units for heritage building
Cheshire Police HQ, Chester, UK
New construction regional police headquarters
4 Floors – 160 Induction Units per floor
Total: 536 units
Consulting Engineer: URS Liverpool
Redvers House, Sheffield, UK
Replacement of an existing A/C system
8 Floors – 38 Units per floor
Total: 309 Active Chilled Beams
Consulting Engineer: FHP Partnership
City Exchange Building, Leeds, UK
Replacement of an existing all air system with active chilled beams
20 Floors — 35 Units per floor
Total: 692 Active Chilled Beams
Consulting Engineer: FHP Partnership
James C Maxwell Building, University of Edinburgh, UK
New Construction – Laboratory
Total: 40 units
Consulting Engineer: Forth, Edinburgh
Polimi Leco, Politecnico di Milano, Italy
Polimi Como, Politecnico di Milano, Italy
British Embassy, Stockholm, Sweden
Boots the Chemist HQ, Nottingham, UK
Cheshire Police HQ, Chester, UK
Redvers House, Sheffield, UK
City Exchange Building, Leeds, UK
James C Maxwell Building, University of Edinburgh, UK
ASIA
Science Block A & B at United World College, Singapore
Science Block A & B at United World College, Singapore
Junior Secondary Schools, Trinidad and Tobago
Hilton, Colombo, Sri Lanka
Gateway of India Office Complex, Mumbai, India
Science Block A & B at United World College, Singapore
AUSTRALIA
115,000 sqft, 5 story office building Total: 554 IDS60e Inffusers 460,000 sqft replacement of existing Carrier induction units with Active Chilled Beams. Total 576 ACB 50 Active Chilled Beams. 130,000 sqft renovation of existing Heritage woolsheds to prime grade office space 166,000 sqft 15 story office tower – 64 Active chilled Beams per floor Total: 942 ACB 50 and ACB 30 Active Chilled Beams
29-31 Brindabella Circuit, Canberra
with all-air 51.8F
(low temperature primary)
system with a VAV perimeter
and constant volume core.
Suncorp Tower, 259 George St, Sydney
43 Floors – 15 Active Chilled Beams per floor (perimeter only), with significant increase in cooling capacity with reduction in air noise generation, while using existing ductwork and secondary chilled water infrastructure and risers.
Walsh Bay, Pier 8 & 9, Sydney
Total: 350 Exposed ACB 20
Active Chilled Beams
with condensate drains
Santos Headquarters, 60 Flinders St, Adelaide
29-31 Brindabella Circuit, Canberra
Suncorp Tower, 259 George St, Sydney
Walsh Bay, Pier 8 & 9, Sydney
Santos Headquarters, 60 Flinders St, Adelaide
AMERICA
North America
2006 – 2007 renovation of façade and major building services of a 15 story commercial office building providing 244,961 rsf. Total: 750 ACB 50 Active Chilled Beams Proteomics and Nano Biotechnology lab, Silverman Hall at Northwestern, University, IL 2009 3 story new construction of labs and office space Total: 300 ACB 40 Active Chilled Beams 2010 – 520,000 sqft multi-story new facility which includes 345 medical-surgical beds, 50 intensive care unit beds and 20 operating rooms. This project is USGSB LEED Silver Certified. Total: 300 ACB 40 Active Chilled Beams 2009 – 2012 $110m renovation of 30 story 1.4m sqft with full scale upgrade of perimeter induction system with a target to improved energy efficiency over the original system of 30% and to undertake the renovation while the building was still occupied. Total: 5103 HEPIU Induction Units 7 brand new LEED compliant schools: Wayne High, Weisenborn Middle, Rushmore Elementary, Monticello Elementary, Valley Forge Elementary, Kitty Hawk Elementary and Standpipe Elementary. Total: 2440 Inffuser Units – Seven schools total 24,000 sqft, 2 story renovation, to create a brand new state-of-the-art education and training center. 2010 – 2012 500,000 sqft new construction state-of-the-art research and education facility including wet research, clean rooms, research core space and administrative space. Facilities include UMMS Advanced Therapeutics Cluster, comprising the RNA Therapeutics Institute, Center for Stem Cell Biology and Regenerative Medicine and the Gene Therapy Center; the Department of Quantitative Health Sciences; and the Center for Experiential Learning and Simulation. Total: 1160 ACB40 Active Chilled Beams The four-story, 115,000 sqft facility is pending LEED Gold certification; Systems incorporate many energy-efficient features including one of the first applications of “chilled beams” in the state of Florida. UF’s new facility includes space for research, laboratories, academic, office, and conference and support areas. Total: 194 ACB 40 Active Chilled Beams
250 South Wacker Drive, Chicago, IL
Silverman Hall at Northwestern, University, IL
National Naval Medical Center Warrior Transition Unit, Bethesda, MD
Everett M. Dirksen Federal Courthouse Building, Chicago, IL
Huber Heights County School System – Ohio
TACO Innovation and Development Center, Cranston, RI
Dadanco supplied, ACB40 Active Chilled Beams, DPB Passive Beams and Radiant Ceiling panels.
University of Massachusetts Medical School – Albert Sherman Center
University of Florida – Research and Academic Centre, Lake Nona, FL
250 South Wacker Drive, Chicago, IL
Silverman Hall at Northwestern, University, IL
National Naval Medical Center Warrior Transition Unit, Bethesda, MD
Everett M. Dirksen Federal Courthouse Building, Chicago, IL
Huber Heights County School System – Ohio
TACO Innovation and Development Center, Cranston, RI
University of Massachusetts Medical School – Albert Sherman Center
University of Florida – Research and Academic Centre, Lake Nona, FL
Mexico
Ericsson Gold Building – Phase 1 & 2 – Mexico City
Ericsson Global Network Operations Center.
DADANCO supplied a total quantity of 566 x ACB40 (2-way) and 35 x ACB30 (1-way) active chilled beams.
Corporative Moras 850 – Mexico City
DADANCO supplied a total quantity of
- 369 x ACB40 (2-way) chilled beams and
- 394 x IDL20E (linear slot) Inffusers
Siemens – Polanco – Mexico City
New LEED Gold Corporate offices
DADANCO supplied a total quantity of 224 x ACB30 (1-way) active chilled beams.
AXA – Santiago de Queretaro, Mexico
First all-Inffuser project in Mexico.
DADANCO supplied a total quantity of 400 x IDL10e & IDL20e (linear slot) Inffusers.