2010 – 520,000 sqft multi-story new facility which includes 345 medical-surgical beds, 50 intensive care unit beds and 20 operating rooms. This project is USGSB LEED Silver Certified.
2009 – 2012 $110m renovation of 30 story 1.4m sqft with full scale upgrade of perimeter induction system with a target to improved energy efficiency over the original system of 30% and to undertake the renovation while the building was still occupied.